109 Extension

Malcolm Miles
Saturday, August 10, 2002 10:42 AM

On Sat, 10 Aug 2002 16:13:15 +1000, you wrote:

And this is how the terminus looked this morning. The old rail has all
been removed and the new track bed is being dug.

A new crossover is being installed about 100m west of the old 109
terminus and the crossover at Balwyn (outside McDonalds) is being
removed.

--
Best wishes,
Malcolm