Re: Re: Re: Trackwork on Domain Rd
  pn1

I understand a super stop is about to be constructed in Domain Road.

But what are the plans for services along Domain Road?

Could it be that there will be a major reconfiguration of tram routes after the opening of the Metro tunnel?

The forthcoming works at Swanston and Victoria Streets are part of the plan?

And what about the missing link between the 58 and the 1?

Possibly the time to get the shots of existing operations - while one can?

Paul in Melbourne (currently in Honolulu)