Re: South Yarra tram stop - a new design
  Mal Rowe

On 19/06/2021 17:42, Andrew C wrote:
> The yellow? lane marking to separate cyclists from those waiting for the tram helps


Yes, yellow - and lots of tactile buttons on the pavement as a reminder. (Pic attached)

The tram platform is actually a bit higher than the footpath and there is a step down from the centre of the platform to that footpath as well as two ramps - one for bikes and one for pedestrians - at each end.  The step is also surrounded by a sea of tactile buttons.

>

> Many E class have been travelling along Toorak Road and some further down St Kilda Road during the last few weeks. I was told it was route familiarisation for Southbank drivers.

>

Thanks - I guessed that was a more likely explanation than a clearance test in the middle of Saturday traffic.

Mal Rowe - learning

Show full size
Tramstop ToorakRd SouthYarra 19Jun2021  |  1536W x 1050H  | 404.88 KB |  Photo details