Fw: Mon.7.10.24 daily digest, austerity issue.
Roderick Smith
Tuesday, October 8, 2024 1:17 AM
----- Forwarded message -----
To: [email protected] <[email protected]>
Sent: Tuesday 8 October 2024 at 12:14:18 pm AEDT
Subject: Mon.7.10.24 daily digest, austerity issue.
Roderick
Mon.7.10.24 Metro X
Buses replace trains on sections of the Hurstbridge line until the last train of Thu 24 Oct (works). Heidelberg - Hurstbridge until the last train of Mon.7.10. https://tinyurl.com/bdh6u2hv
Pedestrians and cyclists now have safer access to the Keon Park Station precinct with the opening of a signalised intersection at High Street and Hughes Parade. We removed the Keon Parade level crossing earlier this year. Read more about the project: https://bit.ly/3ZnOhP8
19.00 Hurstbridge line: Buses to replace trains Clifton Hill - Heidelberg (a track fault in Westgarth area). Planned works-replacement buses will be extended to operate Clifton Hill - Hurstbridge. Buses ordered, ETA 60min. Consider alternative transport for local trips.
- 21.52 Trains have resumed.
Buses replace trains Richmond - Glen Waverley from 20.25 until the last train (maintenance and renewal works). https://tinyurl.com/bdftxr8z
Lilydale/Belgrave/Alamein lines: Buses replace trains Parliament - Burnley from 20.35 until the to last train (maintenance and renewal works). https://tinyurl.com/yvb8feyr
Sunbury/Craigieburn/Upfield lines: All trains direct to/from Flinders St from 21.00 until the last train (maintenance works). • From loop stations, take a train from pfm 1 to Flinders St.
Trains operate as shuttles Caulfield - EastPakenham/Cranbourne from 21.00 until the last train (works). Change from/to a Frankston train.
https://www.smh.com.au/national/nsw/never-be-able-to-join-the-city-together-again-critics-lash-scrapping-of-major-central-station-plan-20241007-p5kgef.html
https://www.watoday.com.au/national/western-australia/after-16-years-and-never-ending-promises-we-finally-know-when-the-ellenbrook-train-line-will-open-20241007-p5kggs.html
https://www.canberratimes.com.au/story/8783825/staged-opening-could-get-passengers-on-light-rail-stage-2b-sooner
To: [email protected] <[email protected]>
Sent: Tuesday 8 October 2024 at 12:14:18 pm AEDT
Subject: Mon.7.10.24 daily digest, austerity issue.
Roderick
Mon.7.10.24 Metro X
Buses replace trains on sections of the Hurstbridge line until the last train of Thu 24 Oct (works). Heidelberg - Hurstbridge until the last train of Mon.7.10. https://tinyurl.com/bdh6u2hv
Pedestrians and cyclists now have safer access to the Keon Park Station precinct with the opening of a signalised intersection at High Street and Hughes Parade. We removed the Keon Parade level crossing earlier this year. Read more about the project: https://bit.ly/3ZnOhP8
19.00 Hurstbridge line: Buses to replace trains Clifton Hill - Heidelberg (a track fault in Westgarth area). Planned works-replacement buses will be extended to operate Clifton Hill - Hurstbridge. Buses ordered, ETA 60min. Consider alternative transport for local trips.
- 21.52 Trains have resumed.
Buses replace trains Richmond - Glen Waverley from 20.25 until the last train (maintenance and renewal works). https://tinyurl.com/bdftxr8z
Lilydale/Belgrave/Alamein lines: Buses replace trains Parliament - Burnley from 20.35 until the to last train (maintenance and renewal works). https://tinyurl.com/yvb8feyr
Sunbury/Craigieburn/Upfield lines: All trains direct to/from Flinders St from 21.00 until the last train (maintenance works). • From loop stations, take a train from pfm 1 to Flinders St.
Trains operate as shuttles Caulfield - EastPakenham/Cranbourne from 21.00 until the last train (works). Change from/to a Frankston train.
https://www.smh.com.au/national/nsw/never-be-able-to-join-the-city-together-again-critics-lash-scrapping-of-major-central-station-plan-20241007-p5kgef.html
https://www.watoday.com.au/national/western-australia/after-16-years-and-never-ending-promises-we-finally-know-when-the-ellenbrook-train-line-will-open-20241007-p5kggs.html
https://www.canberratimes.com.au/story/8783825/staged-opening-could-get-passengers-on-light-rail-stage-2b-sooner