TAN: Newark, NJ, aka "The Beauty And The Beast". 1 of 2
Peter D. Ehrlich
Monday, September 3, 2001 6:57 AM
Hi, gang!
Since we've been on an "Ugly" topic for a while, I'm taking it one step
further. How about "The Beauty And The Beast"?
Case in point: The picture with this message is of Newark, NJ PCC 7 ("The
Beauty") at Heller Parkway, taken by me on August 20, 2001, five days before
Newark's PCCs were retired.
The second picture--attached to the next message--is of the replacements for
the PCCs: brand-new Kinki-Sharyo low-floor LRV 101 ("The Beast") at Broad
Street, shot August 27, 2001, the first day of operation with the new cars.
These are beasts in more ways than one: Whereas the public was getting
reliable 6-minute service headways and 12-minutes running time from end to
end, on the first day of the new LRVs, waits of up to 30 minutes were
frequent, and running time increased to 20 minutes or more. Cause: door
problems, cab signal problems, etc. The public was not pleased.
------------------------ Yahoo! Groups Sponsor ---------------------~-->
Get your FREE credit report with a FREE CreditCheck
Monitoring Service trial
http://us.click.yahoo.com/MDsVHB/bQ8CAA/ySSFAA/DiTxlB/TM
---------------------------------------------------------------------~->
Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
Since we've been on an "Ugly" topic for a while, I'm taking it one step
further. How about "The Beauty And The Beast"?
Case in point: The picture with this message is of Newark, NJ PCC 7 ("The
Beauty") at Heller Parkway, taken by me on August 20, 2001, five days before
Newark's PCCs were retired.
The second picture--attached to the next message--is of the replacements for
the PCCs: brand-new Kinki-Sharyo low-floor LRV 101 ("The Beast") at Broad
Street, shot August 27, 2001, the first day of operation with the new cars.
These are beasts in more ways than one: Whereas the public was getting
reliable 6-minute service headways and 12-minutes running time from end to
end, on the first day of the new LRVs, waits of up to 30 minutes were
frequent, and running time increased to 20 minutes or more. Cause: door
problems, cab signal problems, etc. The public was not pleased.
------------------------ Yahoo! Groups Sponsor ---------------------~-->
Get your FREE credit report with a FREE CreditCheck
Monitoring Service trial
http://us.click.yahoo.com/MDsVHB/bQ8CAA/ySSFAA/DiTxlB/TM
---------------------------------------------------------------------~->
Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/