Re: Melbourne Tram Depot & Link Development
  Chris Gordon

> A terminus in St Georges Rd would be over the old water main - something that

> has never been acceptable before. The two existing crossings of the plantation

> are on 'buried bridges' to avoid any limit to access or strain upon the water

> main beneath the plantation.


Attached is option A plan which shows the St.Georges Road layout.

The last link to the tdu.to PDF didn't work so I will leave that out this time.

Chris.



track-link-a