Re: Preston workshops upgrade
  Mal Rowe

On 05/12/2022 16:07, Mal Rowe wrote:
> The test track is currently isolated and the tracks east of the pit shed have been removed.  It looks like an extension to that shed will be built in that area.

>

Well, that took a long time!

Here's the pic from Dec 2022 : https://tdu.to/i/81361

When I visited in late November this year the test track was re-connected and a large two storey  extension to the 'pit shed' was visible.

Mal Rowe watching Yarra fill in the spaces at Preston

Show full size
Pit-shed Preston 23Nov2023  |  1891W x 1050H  | 667.12 KB |  Photo details