Re: Re: Why Sydney will end up with three incompatible metro train lines
  TP

As I mentioned on the bus forum Brian, the station boxes are excavated to
more than 8 car train length, but at the opening stage the platforms will
be for 4 cars. At the 2 minute headways that the metro is capable of, four
car metro trains can move about 22,500 passengers per hour per direction.
This is almost as many as the busiest peak service that the suburban system
is capable of (the lower North Shore) which can move about 24,000 pphpd.

Tony P

On Monday, 29 May 2023 at 12:44:26 UTC+10bblun...@... wrote:

> I was concerned to read that the WSA Metro was going to be restricted to

> 4-car trains.

>

> Is this going to impede future growth on a 50 km route?

>

> Brian

>

> On Monday, 29 May 2023 at 12:16:11 pm AEST, TP histor...@...>

> wrote:

>

>

> There will be no need for rolling stock transfers between lines. They're

> all going to grow in patronage, so each will get additional new stock as it

> grows. No line will be in a position to give up stock.

>

> The Western Sydney (Airport) Metro is going to be over 50 km long when

> it's completed through to Schofields and Macarthur. That's not short!

>

> Yes, the suburban system will be able to roll out automation as the ETCS

> is expanded, but the RTBU (which is represented on the Administrative

> Committee of the NSW ALP) will ensure that there's still a driver at the

> front, even though he'll only be reading a book during the journey, and

> guards to stick their heads out at the back - plus the Fat Controller on

> the station to deploy the accessible ramp. And thus this 19th century crock

> will reverse into the future.

>

> Tony P

>

> On Monday, 29 May 2023 at 11:03:16 UTC+10 Matthew Geier wrote:

>

> There is a difference between operating lines independently to

> deliberately making them technically incompatible so that even things

> like rolling stock transfers to balance changing demands are impossible.

>

> The only good thing is that maybe these other two lines will get an

> automation that can properly drive the trains unlike the 'bang-bang'

> controller Alstom has on the NW metro.

>

> I still can't see the justification for making the airport metro 25kv

> AC. Short route, short trains. The route is sufficiently short that

> having 3 phase breaks to balance the load will be an issue, so they may

> have to go to 'converter' substations that take 3 phase from the

> distribution network, turn it into DC and then into single phase AC for

> the overhead. Then each train has to take the single phase AC, step it

> down, turn it into DC and then feed it into a VVVF converter to make 3

> phase for the train motors.

>

> Will the extra complexity offset the 'transmission efficiency' of the

> 25kv OCS ?

>

> I'm waiting for some one to realize that automation could be applied to

> the double-deck stock too. Not to many more years till some one realizes

> the ETCS upgrade for Sydney trains is a precursor to GoA4 on the

> 'conventional' network. The union will not be impressed, but by blocking

> DOO they have made the case for automation stronger.

>

>

>

>

> --

> You received this message because you are subscribed to the Google Groups

> "TramsDownUnder" group.

> To unsubscribe from this group and stop receiving emails from it, send an

> email totramsdownunde...@....

> To view this discussion on the web visit

>

> https://groups.google.com/d/msgid/tramsdownunder/17ec3378-da09-4ab7-88f2-3bd63380821dn%40googlegroups.com

> https://groups.google.com/d/msgid/tramsdownunder/17ec3378-da09-4ab7-88f2-3bd63380821dn%40googlegroups.com?utm_medium=email&utm_source=footer

> .

>