On Mon, 5 Dec 2022 10:26:09 +1100, Mal Rowe wrote:
>Here are some more pics from Vincent Chan's 'eye in the sky':
>Final Pic looks across towards Domain Rd. The actual road is between
>the trees and the buildings at right and is covered with construction sheds.
>
>The closest track leads to Park St, next track is the 'mainline' north
>up St Kilda Rd, first track behind the big vent shafts is the southbound
>'mainline' and trck beyond that is the track leading to Domain Rd.
I'm trying to reconcile pictures:
The picture "Eastwards towards DomainRd 5Dec2022" shows two tracks heading inbound northwards to ANZAC station out of shot to left of pic - one track from St Kilda Road, the other track from Domain Road seemingly crossing over the St Kilda Road track.
The plans previously posted ("Anzac Tramway 2017 draft" posted 3 Dec 2022 11:30:) show two inbound tracks along ANZAC station with a thin (green) platform for the line that will curve into Park Street and NO points at the inbound end of ANZAC.
However, the pic "Anzac Station 3Dec2022" posted on "Sat, 3 Dec 2022 19:57:25" shows only a single inbound track along ANZAC station with points for Park Street or St Kilda Road at the inbound end of the platform and single track as far back as I can see.
Question: where did the second track (the one from Domain Road) go? Is there a set of points in between these two pics that brings the two lines into one?
Yuri.
(Could Vincent do a panorama or a set of overlapping shots all the way from Domain Road to Park Street please?)
--
Gallery at https://tinyurl.com/trams4me
----------------------------------------