On 05/12/2022 06:28, David McLoughlin wrote:
>

> Don't even get me started on the 10 days it took Melbourne to lay that entire new tram line along Toorak Road West, with trams running on it on the 11th day. Eat that Sydney and your four years for laying the same length of track (x 12, Sydney did about 12 simultaneous sections of similar length, taking four years of massive disruption.  During that period, and in much shorter time,  Canberra laid an entire brand new tramway of similar length and got it running).


To be fair, there was quite a bit of preparatory work done in Toorak Rd West before the tramway was built - including relocating a gas main and changing sewer access points. (See pic).

However, at least they *knew *they were there rather than being surprised to come across them!

Mal Rowe - attaching a pic of a curve that will presumably be renewed.

Show full size
Gas-main-renewal ToorakRdWest 10Feb2017  |  1575W x 1050H  | 470.49 KB |  Photo details
Show full size
226 ParkSt-into-ToorakRd 10Feb2017  |  1575W x 1050H  | 408.5 KB |  Photo details