Re: Re: L1 LIGHT RAIL TRACKWORK 19-24 NOVEMBER
  bblunt3473


- Some photos of the works today:
- 1. The bridge over Eddy Ave.
- 2. New tracks on the outbound curve into Hay St
- 3. New rails being fixed on the inbound curve
- 4. Old rails being loaded onto a semi-trailer.

On Saturday, 19 November 2022 at 04:09:45 pm AEDT, TP historyworks@...> wrote:

Going by photos on another forum, work is well underway on both curves at the bottom (Hay St) of both ramps from Central terminus, but not the upper curves. Work is also underway on the steel bridge across Eddy Ave.
Tony P

On Friday, 18 November 2022 at 21:39:12 UTC+11 TP wrote:

It'll be interesting to see where the track replacement occurs. We could probably guess the first one. Bear in mind that IWLR has been running for up to 25 years. The question is whether the rate of wear accelerated after the new trams were introduced.
Tony P

On Friday, 18 November 2022 at 21:06:33 UTC+11gregsut...@... wrote:


https://www.transport.nsw.gov.au/news-and-events/media-releases/l1-light-rail-trackwork-19-24-november


L1 LIGHT RAIL TRACKWORK 19-24 NOVEMBER
Published 18 Nov 2022
Customers are advised to plan ahead with L1 light rail services disrupted from 6am Saturday 19 November to 11pm Thursday 24 November. 

Transport for NSW Chief Operations Officer, Howard Collins said the disruption on the Inner West Light Rail line is due to essential maintenance works, including track replacement. 

“There will also be major refurbishment works on the light rail underbridge at Eddy Avenue, which will take place across several stages to reduce disruption.”

“During this stage, we will be carrying out maintenance on the bridge structure, including a new paint job, while also putting in traffic control and pedestrian safety measures,” Mr Collins said. 

“The next stage of upgrade works is planned for April next year, with the final stage of works carried out in June, weather permitting.”

No L1 services will run this weekend from 6am Saturday 19 November to 11pm Sunday 20 November. Buses will replace all L1 services between Central Grand Concourse and Dulwich Hill during this time.

L1 services will also be impacted the following week. 
From 6am Monday 21 to 11pm Thursday 24 November, L1 replacement bus services will run partially between Central Grand Concourse and The Star via Convention. 

L1 light rail services will run between Convention and Dulwich Hill as per normal frequency. 

Mr Collins said there will also be some road closures from 3am Saturday 19 November to 3am Friday 25 November. This will affect Hay St between Elizabeth St and Pitt St, as well as Railway Colonnade Dr between Lee St and Hay St.

“Eddy Avenue will remain open in both directions whilst the works are completed.” 

“Buses will operate as normal along Eddy Avenue but will divert around Hay Street.”

"Traffic controllers will be on site to assist pedestrians and monitor traffic flow throughout the works and we thank commuters for their cooperation” Mr Collins said. 

Travellers are encouraged to plan ahead using the trip planner app or visit transportnsw.info



Show full size
DSC00142 (Small)  |  640W x 480H  | 161.03 KB |  Photo details
Show full size
DSC00144 (Small)  |  640W x 480H  | 134.36 KB |  Photo details
Show full size
DSC00148 (Small)  |  640W x 480H  | 161.06 KB |  Photo details
Show full size
DSC00151 (Small)  |  640W x 480H  | 160.98 KB |  Photo details