Fw: Sat.19.12.20 daily digest
  Roderick Smith

----- Forwarded message -----

To:australiantransportnews@... australiantransportnews@...>
Sent: Friday, 2 April 2021, 04:31:20 pm AEDT
Subject: Sat.19.12.20 daily digest, plus Fri.18.12.20 part 2

No photos

Roderick

Sat.19.12.20 Metro Twitter
Buses replace trains between Laverton and Werribee until the last train of Sun.27.12  (level-crossing removal). 
In force until late 2021.  South Gippsland Highway, Dandenong South is reduced to one lane towards Cranbourne, as level-crossing work continues. Be alert for changes between Princes Hwy and Dandenong Bypass. See  http://levelcrossings.vic.gov.au/disruptions/south-gippsland-highway-dandenong-south-changed-traffic-conditions
In force until December: On Princes Hwy (Dandenong, near South Gippsland Hwy, for level-crossing works) traffic is reduced to two lanes in both directions, with speed set at 60km/h. Merge with care. See http://levelcrossings.vic.gov.au/disruptions/princes-highway-dandenong-south-changed-traffic-conditions
Buses replace trains Ringwood - Lilydale until last train of Sun 20 Dec (level-crossing works).
Craigieburn line: All trains run direct to/from Flinders St all day (maintenance works).  From loop stations, take a Flinders St train from pfm 3.
Pakenham/Cranbourne lines: Trains will run to an altered timetable Flinders St-Caulfield from 10.00 to 18.30 today (works).  All trains will stop all stations.
Frankston line: All trains will terminate/originate at Caulfield from 10.00 to 18.30 (works). Change to/from a Pakenham/Cranbourne train.
11.50 Lilydale/Belgrave lines: Major delays after a police action at Mont Albert. 
Buses replace trains Moorabbin - Frankston/Stony Point from 0.40 to 18.30 Sun 20 Dec (maintenance works).