Re: E class progress
  Daniel Bowen

On Sat, 4 Jul 2020 at 09:31, Mal Rowe mal.rowe@...> wrote:

> There is an infrastructure reason for the length of the Es - they are

> constrained by the practical limit on platform length of the blocks in the

> north-south streets.

>

Hi Mal, just wondering if you can expand on this point.

Some of the pre-existing platform stops on the east-west CBD streets were
extended to cope with the Es, but I'd have thought most of the platforms on
the north-south streets are far longer anyway, most of them extending for a
(half) block?

Regards,
Daniel