Here is an interesting video dating from May 2013.
It has some interesting points of comparison with Sydney's CSELR currently under construction.
For example:
* speed into/out of stops and along the right of way
* overhead design which is done well and support poles which are not excessive in size
* use of grass track (according to TfNSW and their expert consultants this can't be done in Sydney)
* tram stops on grades (again something which "can't be done in Sydney" but can in Melbourne and on the Gold Coast
* trees not pruned back from tramline
* tram priority over crossing motor traffic
* no APS (ground level power supply) with all overhead power supply (much cheaper to install and much more reliable)
*https://www.youtube.com/watch?v=17M_LuKWaRI*
Greg