Re: TOORAK RD WEST 13.6.17
  Mal Rowe

On 23/06/2017 4:40 PM, Richard Youltressteleg@... [TramsDownUnder] wrote:
>

> Just in from Andrew C.

>

> "A few photos from today. Concrete pouring is working its way down the hill.

>

> 232 About a three metre shaft vertical shaft lined with reinforcing. Maybe concrete lined.

>

That picture (at: http://tdu.to/a54283/DSCN5232.JPG) shows the base for an overhead pole.

I called past late this afternoon and took a few pics, including one up the other end - near Millswyn St.
http://tdu.to/ToorakRdWest-MillswynSt_23Jun2017.JPG

A couple of things worth noting:
1. The crossover seems to have been filled with hot mix rather than crushed rock/concrete. My guess is that this is to avoid fragments getting ito the point mechanism.
2. At the left of the pic, you will se that the tramway is at a lower level than the roadway. This is the location of a platform stop, so the tracks have been lowered to minimise the platform height.

Mal Rowe - who was a bit puzzled about the low track level at first.