Overhead Wire renewal, Huntingdale to Oakleigh last Friday.
  Richard Youl

The modern way of erecting overhead. Much less interesting equipment than in the past.

Both tracks were being done at the same time. I suppose they hoped to be finished before the evening peak, unless the line was already closed for other Skyrail works.

Photos by Graeme Reid.

Regards,

>


Show full size
Photo272  |  1280W x 960H  | 511.04 KB |  Photo details
Show full size
Oakleigh310518  |  1019W x 733H  | 147.37 KB |  
Show full size
Photo277  |  1280W x 962H  | 495.75 KB |  Photo details
Show full size
Photo278  |  1280W x 960H  | 490.21 KB |