Re: Glenelg - Jetty Rd Works
  jg62430

David,
Here is a photo taken today at the same location. 108 is passing the fitness centre which was built on the site of the cinema a year or two ago.

http://tdu.to/2017-04-29_108_Passing_Cinema_Site.JPG http://tdu.to/2017-04-29_108_Passing_Cinema_Site.JPG

Some stretches of rail are corrugated although it can be difficult to see and photograph as the rails are highly polished with all the rubber-tyred traffic. Here is a shot where it shows up on both rails.

http://tdu.to/2017-04-29_Rail_Corrugation_Jetty_Rd__AJC.JPG http://tdu.to/2017-04-29_Rail_Corrugation_Jetty_Rd__AJC.JPG

In Jetty Rd the present rail is plain whereas as Mal noted the replacement will be low profile grooved rail. However the terminus at Moseley Sq is grooved rail. This shot shows the transition from plain to grooved just E of the Square.

http://tdu.to/2017-04-29_Plain_Grooved_Rail_Moseley_Sq__AJC.JPG http://tdu.to/2017-04-29_Plain_Grooved_Rail_Moseley_Sq__AJC.JPG

My previous post got the dates of the closure slightly wrong. It is May 15 - June 9 as can be seen in posters which have appeared on the litter bins in Jetty Rd.

http://tdu.to/2017-04-29_Trackwork_Poster__AJC.JPG http://tdu.to/2017-04-29_Trackwork_Poster__AJC.JPG

During the closure trams will terminate at Stop 15 Brighton Rd. Here is a shot of 205 at the crossover which will be used to reverse the trams.

http://tdu.to/2017-04-29_205_at_Brighton_Rd_Crossover__AJC.JPG http://tdu.to/2017-04-29_205_at_Brighton_Rd_Crossover__AJC.JPG

Alex C - who enjoyed a pleasant autumn afternoon in Glenelg

---InTramsDownUnder@..., <mcloughlin.dj@...> wrote :

Alex C wrote:

> The work in Jetty Rd has been postponed to reduce impact of Jetty Rd business and will now take place May 16 - June 9.

It seems an extraordinarily long time to replace that length of track. I must have got too used to watching such things done in Melbourne on a long weekend.

Meanwhile attached is a Jetty Road photo taken during my last visit, in 2012. Five years is not a long time in tram track life but the tracks looked OK to me. I realise many have said they are actually very corrugated.


david in Wellington, Mayday minus two.M'aidez!

Show full size
2017-04-29 205 at brighton rd crossover ajc  |  1024W x 768H  | 525.63 KB |  Photo details
Show full size
2017-04-29 rail corrugation jetty rd ajc  |  1024W x 768H  | 475.64 KB |  Photo details
Show full size
2017-04-29 trackwork poster ajc  |  768W x 1024H  | 384.91 KB |  Photo details
Show full size
2017-04-29 108 passing cinema site  |  1024W x 768H  | 355.01 KB |  Photo details
Show full size
2017-04-29 plain grooved rail moseley sq ajc  |  1024W x 768H  | 416.87 KB |  Photo details