Re: Construction, CSELR
  Tony Galloway

Looks like I accidentally transposed the pics - top pic for caption #14, bottom pic for #13

Tony G


> On 26 Mar 2017, at 5:27 pm, Tony Gallowayarg@... [TramsDownUnder] TramsDownUnder@...> wrote:

>

> 13 - There was some rail welding on the Down track happening on Anzac Pde opposite NIDA, the National Institute of Dramatic Art. The young lady on the left was coming over to tell me I “couldn’t take any pictures here”. I told her she was wrong, and shouldn’t believe everything she was told by idiot control freak straw bosses. She agreed the situation was “a bit stupid” but felt obliged to tell me anyway.

>

>

> 14 - By this time the Thermit welding for the day had been done, and the work gang was cleaning up the welds with grinders. The amount of reo and concrete under the track is gobsmacking compared to how it’s done in Melbourne.

>

> From here I rode back along Anzac Pde through Kensington, looking at the finished track in the street surface. For some reason the flangeways are filled with bitumen hot mix - it must be some narky requirement imposed by RMS till the line opens. Then I rode home via Cleveland St, Abercrombie St and the Glebe Island bridge. I’ll check out the activity in Devonshire St soon.

>

> Tony G

>